This is main home link
this is headquater image
this is regional image
india flag image Government of India

Central Water Commission

(Serving the nation since 1945)

Help

Accessibility Help
Use the accessibility options provided by this Website to control the screen display. These options allow increasing the text spacing, changing the text size and colour scheme for clear visibility and better readability.

Text Size Icons
Following different options are provided in the form of icons which are available on the top of each page:

increase text size Increase text size: Allows to increase the text size up to one levels

Decrease text size Decrease font size/Decrease text size: Allows to decrease the text size up to one level

Normal text size Normal text size: Allows to set default text size

Changing the Colour Scheme
Changing the colour scheme refers to applying a suitable background and text colour that ensures clear readability. There are three options provided to change the colour scheme. These are:

Default Default contrast scheme

Yellow text Yellow text on Grey background

Black text Yellow text on Black background

Note: Changing the colour scheme does not affect the images on the screen.

Related Links:

What's New in CWC

A Brainstorming Session with Former Chairmen / Members of CWC was held on 11.5.2019 at New Delhi to discuss various aspects related to role and activities of CWC and to seek their advice for improvement of the same.

new item
21/05/2019

Draft Concept Note on "Premissible Velocity in Concrete Lined Water Condutor System (Head Race Tunnel) Conveying Water for Power Generation.(Uploaded in Circular section for comments within three weeks)

16/05/2019

The total water available in live storage of 91 reservoirs in the country being monitored by CWC was 44.459 BCM as on 18.04.2019.This is 27% of the total live storage capacity of these reservoirs and 103% of storage of average of last ten years. The overall storage position is more than the ..Read More

22/04/2019

Govt of Gujarat has signed MoU on 7th January 2019 with Central Water Commission and CWPRS at Gandhinagar for Implementation of Coastal Management Information System (CMIS) in the State.

10/01/2019

Chairman, Central Water Commission handed over Emergency Action Plan document of Hirakud Dam to Principal Secretary, Odisha Water Resources Department on January 10 , 2019 at Rajiv Bhawan, Bhubaneswar. The EAP has been prepared under DRIP to act as model document for other Dam owners.

10/01/2019