Details of rules, regulation, instruction manuals, records held by it or under its Control or used by its Employees for discharging its functions are given in the following paragraphs:
5.1 Administrative
- Fundamental Rules
- Supplementary Rules
- Leave Rules
- Travelling Allowance Rules
- LTC Rules
- Medical Attendance Rules
- Central Civil Services (Conduct) Rules
- Central Civil Services (CCA) Rules
- Central Civil Services (Pension) Rules
- Central Civil Services (Commutation of Pension) Rules
- Central Civil Services (Temporary Service) Rules
- General Provident Fund Rules
- Staff Car Rules
- Brochure on Reservation for SC & ST in Services
- Manual of Office Procedure
- CPWD Manual Vol. I and II
- CPWD Accounts code
- Delegation of Financial Powers Rules
- General Financial Rules
- Powers available to CWC Officers
- CW&PC Manual
5.2 Technical
Following technical documents are held/referred by its employees for discharging their functions:
5.2.1 General
- Broad Guidelines for Preparation of Project Estimates for Major Irrigation and Multipurpose Projects (CWC)
- Topographical Sheets of Survey of India available in CWC’s Map record section (SOI)
- Guidelines for preparation of Detailed Project Report of Irrigation and Multipurpose Projects by Working Group of the then Ministry of Irrigation (CWC)
- BIS Codes on related topics (BIS)
Some of the important manuals, guidelines and past references along with BIS codes and various Journals/Publications, which are frequently referred by individuals from time to time, are as follows:
5.2.2 WP&P Wing
- Guidelines for Less Water Consuming Cropping Pattern for Irrigation Systems in Drought Prone Areas (CWC)
- Guidelines for Preparation of River Basin Master Plan (CWC)
- Guidelines for the Provision of Drinking Water Supply System in Multipurpose and Irrigation Projects (CWC)
- Guidelines for Submission, Appraisal and Clearance of Irrigation and Multipurpose Projects (CWC)
- Guidelines for Preparation of Revised Estimates of the Project and Appraisal Procedure (CWC)
- Guidelines for Monitoring of Irrigation Projects (CWC)
- Guidelines for Planning Conjunctive Use of Surface and Ground Waters in Irrigation Projects (CWC and INCID)
- Guidelines for Standard Equipment Specifications (CWC)
- Guide lines/Norms for Detailed Calculations for the requirement of each category and size of the earth moving and production equipment-Working Group Report (CWC)
- Report of the Committee to Review Existing Criteria for Working out Benefit Cost Ratio for Irrigation Projects (CWC/Planning Commission)
- Evolution of Project Preparation & Appraisal in the Irrigation Sector (CWC)
- Guidelines for Preparation of Status Report of Monitored Projects (CWC)
- Guidelines for Accelerated Irrigation Benefits Programme (MOWR )
- Guidelines for Environment Impact Assessment of River Valley Projects (Ministry of Environment and Forests )
- A Guide for estimating Irrigation Water Requirements ( Ministry of Agriculture )
- Manual on Irrigation Water Management ( Ministry of Agriculture and Irrigation)
- Water Management Manual (Ministry of Water Resources )
- Indian Standard Guidelines for Allocation of Cost Among Different Purposes of River Valley Projects (BIS)
5.2.3 D&R Wing
- Manual on Design Fabrication, Erection and Maintenance of Steel Penstocks (CWC)
- Manual on Hydraulic Design of Gates (CWC)
- Manual on Design of Radial Gate (CWC)
- Manual on Design of High Head Gates and Rope Drum Hoist (CWC)
- Manual on Design of Weirs and Barrages on Permeable Foundations (CWC)
- Manual on Canal falls (CWC) 7. Manual on Irrigation and Power Channels (CWC)
- Manual on Lining of Canal in Expansive Soils (CWC)
- Design Flood Manual (CWC)
- Manual on Hydraulic Design of Overflow Spillway Crest (CWC)
- Guidelines for Planning of Parallel Canals (CWC)
- Guidelines for Safety Inspection of Dams (CWC)
- Compendium on Silting of Reservoir (CWC)
- Sub-Zonal Flood Estimation Reports (CWC)
- Model Study Report used for Design and Drawings for River Valley Projects (CWC)
- Technical Specifications (CWC)
- Design / Technical Memorandum (CWC)
- National Register of Large Dams (CWC)
- Report on Dam Safety Procedures (CWC)
- Estimation of PMF using PMP Atlas (Southern peninsular rivers except Krishna Basin) (CWC)
- PMP Atlas for Ganga Basin (CWC)
- Manual for estimation of probable maximum precipitation (PMP) (WMO No. 332)
- Atlas for 1 day point PMP (IMD)
- Atlas for 1 day point PMP (IITM)
- Concrete Manual (USBR)
- Earth Dam Manual (USBR)
- Design of Small Dams (USBR)
- Design of Gravity Dam (USBR)
- Design Standards-Embankment dam (USBR no.13)
- Concrete Dam (CBIP no.266)
- Manual on Tunnel (CBIP)
- Life of Reservoirs (CBIP)
5.2.4 RM Wing
- Guidelines for Preparation, Submission, Appraisal and Clearance of Flood Management Schemes (CWC)
- Manual on Flood Forecasting (CWC)
- Manual on Hydrological Observation (CWC)
- Embankment Manual (CWC)
- Enhancement of powers of the State Governments for the sanction of flood control, drainage, anti-water logging and anti-sea erosion scheme – (Planning Commission, I&CAD Division)